We are building a new airport runway, and ripping out the old one. The runway lights have to be replaced and get new wire. So I am taking all the old ripped out wire. (obviously, I got permission first). This is my first load, of probably 3 or 4 more loads around this size.
After I sorted it out. I have, 139lbs insulated braided copper wire, and 33lbs of braided aluminum wire.
Bookmarks