This is the last load hauled to date of the water tanks. It was taken after all of the chains and com-a-longs were removed, six total. Additional cast iron pipes will be hauled after the demolition of the pump house. I also have to retrieve an aluminum spiral stair case from the pump house that I am looking for a home for.
http://i1277.photobucket.com/albums/...ps7defbfea.jpg