Results 1 to 3 of 3

Long Days

| A Day in the Life of a Scrapper
  1. #1
    F350scrapper started this thread.
    F350scrapper's Avatar
    SMF Badges of Honor


    Member since
    May 2014
    Location
    Minnesota
    Posts
    156
    Thanks
    71
    Thanked 151 Times in 68 Posts

    Long Days

    First had to bring in two loads before the yard closed at 12. Then I was off to clean the yard up more and break down 20+ ac units and humidifiers. Took 5 hours and many cuts later haha. Only yielded 15 pounds of copper on top of all the other usual items in them hardly seems worth it.


  2. The Following User Says Thank You to F350scrapper for This Post:



  3. #2
    Copper Head's Avatar
    SMF Badges of Honor



    Member since
    Aug 2011
    Location
    Up North
    Posts
    1,883
    Thanks
    579
    Thanked 1,014 Times in 516 Posts
    still must of ended up with some good weight on the AL CU exchangers . Heck your good though to stay the course with that many units. I kinda dread them
    but ya gotta do em .

  4. #3
    eesakiwi's Avatar
    SMF Badges of Honor



    Member since
    Dec 2010
    Location
    NZ
    Posts
    2,531
    Thanks
    2,909
    Thanked 2,556 Times in 1,227 Posts
    Even though the compressor on those heat invertors (that's the larger home installed heater/cooler units we have here in NZ) (not the window box units I see in American movies, that are coolers that are stuck into window spaces..) are bigger.
    They don't seem to yeald much more copper than a normal fridge compressor, which seems pretty standard at 2lbs or maybe 1Kg of Copper.
    They also take more work to cut them open.
    I cut around thru the spot welds on the outside and sledge hammer them apart, maybe more grinding to loosen it.
    Then? Well the standard amount of Copper, though some have a nice Brass counterweight on the end of the shaft.
    Then I'm stuck with some Ali contaminated heavy Iron and part of the casing, with a slot ground down one side of it too loosen the iron core/Copper windings part of the unit.

    I started today at 3pm, walked 10 blocks with tools, scrapped CRT TV's, some electronics, gotta electric motor, sacked it up and hidden sack, finished scrapping at 6:30 when it got dark, walked another 10 blocks to fre wifi.
    Doing this till close to 8:30+ when I goto supermarket, get food, walk back to sack, prep it for carrying the last
    ten blocks to home, then clean down copper and clip plastic coated wire and ribbon cable, probably finish about 11pm.
    Spot yah later guyz.

  5. The Following 2 Users say Thank You for This Post by eesakiwi:



  6. Similar threads on the Scrap Metal Forum

    1. 3 days a week
      By ArgonWelding in forum A Day in the Life of a Scrapper
      Replies: 10
      Last Post: 07-10-2014, 11:27 PM
    2. Some days you win. Some days you lose.
      By bmasyga in forum A Day in the Life of a Scrapper
      Replies: 19
      Last Post: 11-14-2012, 05:59 AM
    3. Some days you win. Some days you lose.
      By bmasyga in forum Misc. Metal Recycling
      Replies: 1
      Last Post: 10-06-2012, 07:29 PM
    4. big two days :)
      By corycouch in forum A Day in the Life of a Scrapper
      Replies: 9
      Last Post: 01-07-2012, 11:16 AM
    5. been down for a few days
      By EcoSafe in forum Introduce yourself
      Replies: 3
      Last Post: 06-01-2011, 09:47 PM

Thread Information

Users Browsing this Thread

There are currently 1 users browsing this thread. (0 members and 1 guests)

 
Browse the Most Recent Threads
On SMF In THIS CATEGORY.





OR

Bookmarks

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •  

The Scrap Metal Forum

    The Scrap Metal Forum is the #1 scrap metal recycling community in the world. Here we talk about the scrap metal business, making money, where we connect with other scrappers, scrap yards and more.

SMF on Facebook and Twitter

Twitter Facebook