Hit the road for Easter, but before put in 17 hrs. into the project. After spending part of a day tipping the towers and collecting some of the non-ferrous, spent another part of a day collecting motors and the rest of the nonferrous. Red flag fire warnings prevented the use of the torch for all but one day. One third of the tower was cut in about three hours. The rest of the time was spent raking the field, stacking the metal, and spreading the piles of corn back throughout the field.
Picture of the skid steer and rake. The rake was used to lift sections of the tower to make it easier to cut and allow the weight of the pipe to assist in the process.
Ground raked to prevent fire.
Metal stacked in the background in native grass in case the project cannot be completed before the field is planted.
And a picture of the wire removed. Over a quarter of mile of wire like this was salvaged from the project.