Just finished phase one of this project which is the clean up portion. The first two pictures are of two separate fires in the pit to take care of rotten fence posts, burnt trees, sheet metal, barb wire, concrete, etc.
This is the one load that was hauled in as scrap. A little over three tons is in the trailer. An estimated 10 tons is stored for higher prices and 50 plus tons of #1 has also been stockpiled for the future.
![]()
Bookmarks