Well I think I did fairly well????? Found this conveyor system was to go up on the auction block. Well I got it for 400.00 +10%. I really wanted the angle iron and some cres for welding projects. Plus looks like I will make a few bucks when all dissmantled and seperated. Would like to know what you all think about large 3 phase motors, better to scrap as is or spend the time removing the windings?? Will be a busy weekend, oh well no pain no gain
Here is item description and photo.
Municipal Airport Surplus Assorted Conveyor Parts & Equipment, Heavy Equipment
•Includes the following:
•Approximately 110 lineal feet of flat plate conveyor to include framing, drive motor and associated stainless steel face plates.
•Portec 36” wide conveyor belt curve sections with sidewalls:
•One 22 degree with drive motors
•One 45 degree with drive motors
•Two 90 degree with drive motors
•One Diverter Belt with motor for a screening belt system
•The following lengths of 36 “ wide with sidewalls straight sections of conveyor belt: 4’, 20’, 21’, 24’, 25’, two 12’, some with drive motors.
•Associated with this equipment are numerous support framing pieces
Bookmarks