Yesterday morning I got down to the residential tower and the guy there told me that he had 25
a/c units instead of 5, plus he had 19 of the mini refrigerators, as I was loading up he told me that he had a situation at another complex so i only ended up with only 9 of the mini a/c units, plus the guy there try to load up my truck with the plastic covers and I told him that I didn't want them, but he proceeded any way to put them on my truck.
So altogether me and my friend started work in breaking them down, he did all of the
freon recovery and i did the total break down of them, the first load brought in $58.78 and i still have the coils to cut out all of the copper loops out of still, I hope it brings me more than what I got off that steel casing that I had.
Bookmarks