A few pictures from the first night.
[IMG]
[/IMG]
[IMG]
[/IMG]
[IMG]
[/IMG]
[IMG]
[/IMG]
[IMG]
[/IMG]
[IMG]
[/IMG]
That was the end of night one. We spent 5 or 6 hours getting what's on the trailer. I took a few more pictures of the hallways but they all look the same. There were 4 hallways. The two that ran East and West were roughly 150' each and the two North and South were about 85' each. The showers (3 "community showers") were each about 18'X20'. The actual shower stalls were tiled with virtually no space above them. The main part of the shower rooms had a false ceiling so we could get to most of the plumbing but couldn't get to the drops to the stalls. There was a main reception area that was an absolute maze of lines in the ceiling. Ridiculous amounts of fittings and was pretty time consuming to cut out. Might have made a mistake trying to cut out everything in the ceiling trying to maximize no.1 copper. it probably would have been faster and easier to cut it all out and clean it up on the ground. The rest of the building was pretty repetitive. Hallways were 3 lines running all the way to the end (Cold water, Hot water and a hot water return line...It had circulating pumps on the water heaters) with drops for every room. There were 60 rooms.
It took us about 8 hours today to finish. Also threw another sawzall in the trash this afternoon. I've always been a Dewalt guy. No particular reason, it just turned out that way. I had an 18V Dewalt die on me this afternoon and was starting to run short of saws (we were down to 2 at that point). I called an electrician buddy of mine and he brought me a 20V Milwaukee...Best sawzall I've ever used. It outworked our corded saws and the batteries lasted twice as long as the Dewalt (in all fairness, that Dewalt was probably 15 years old and so were some of the batteries). Anyway, heck of a tool.
The 2 kids we brought were 13 and 14 years old. Both worked as long and hard as we did and got a taste of "the real world".
There's still some copper left in that building but the effort to get it out just didn't make sense at the end of the day. We just didn't have it in us. lol.
We pulled out triple today what we did last night. Maybe more than triple. We figured out the quickest ways to clear a hallway and get the drops and got in a rhythm. The entire building was repetitive in the hallways and showers. The kitchen was quick and easy and didn't have near the copper I thought it might. I'll load some more pictures of how full the trailer got and once we get it all cut apart tomorrow and reloaded, I'll try to get a final picture of that. We've second guessed ourselves all weekend about the weight of what we got. I originally did the math and came up with about 10,000 pounds. Now, I'm not so sure. One guy guessed about 5000, I went with 7000. No way to know until we sell it. I'm still holding out hope for the 10K.
Bookmarks