Towmotor, cables, and pedal to the metal!!!! You said demo job right so that means the whole building is coming down right? Who cares if you pull a few pipes out of the ceiling give her hell. Pulled 1 inch MCM three strands at a time with a 10,000 lb lift a few hundred feet at a time didn't even untie them just pulled it so hard I thought the roof was going to collapse from where the wire was still tied to it. We tried it with a bigger fork truck 40,000 lb lift but found out the speed wasn't right and it would always snap a cable every few pulls. I am not saying we didn't tear up a few yokes on the towmotor but it got the job done and we pulled miles of the stuff.
Bookmarks